Skip to main content

KPI Comm 3: Deployment

KPI observatory / Quantum Communication

European metropolitan areas, and their nodes, connected by QKD integrated in commercial telecom infrastructure, over terrestrial or satellite links with a secure key rate of at least 100 bit/s.

Official values: survey results of the Quantum Flagship Strategic Advisory Board, as published. Trajectory and live measure: calculations of this portal, not the assessment of the SAB.

Official values

Official values of Comm 3 as published by the SAB (unit: metropolitan areas; nodes)
YearValue (definition page 10)Scorecard (page 4)
20211 metropolitan area; 8 nodes1 (8)
202215 metropolitan areas; 10 nodes15 (10)
202316 metropolitan areas; 10 nodes16 (10)
202420 metropolitan areas; 10 nodes20 (10)
Progression per yearx1.5 (metropolitan areas); x1.3 (nodes)
2030 target25 metropolitan areas; 75 nodes25 (75)

Definition: Official KPI values and 2030 targets

Remarks and method

  • The scorecard gives the maximum number of nodes per area in brackets.

Method as stated: Consensus of the survey for the 2022 value; the booklet lists the connected metropolitan areas (reference Communication 3).

Trajectory (calculated by the portal)

Metropolitan areas

On pace

On pace: recent pace 2021-2024: (20 - 1) / 3 = 6.3 a year; needed pace to 2030: (25 - 20) / 6 = 0.8 a year; compound growth: recent +171.4%, needed +3.8% a year. Portal calculation, not the SAB assessment.

At the recent linear pace the value would be about 58 in 2030.

Nodes (maximum per area)

Slower than needed

Slower than needed: recent pace 2021-2024: (10 - 8) / 3 = 0.7 a year; needed pace to 2030: (75 - 10) / 6 = 10.8 a year; compound growth: recent +7.7%, needed +39.9% a year. Portal calculation, not the SAB assessment.

At the recent linear pace the value would be about 14 in 2030.

The booklet rates each indicator on its own four-level scale (ahead of schedule, on schedule, needs progress, behind schedule); that assessment is not reproduced here.

Definition: Trajectory towards the 2030 target

Live measure of the portal

A proxy calculated by the portal from its own data; it is not the official value and measures something related, not the same thing.

EuroQCI national projects and evidenced communication deployments

25 countries Countries with a national EuroQCI project

Details of the live measure
CountriesAT, BE, BG, CY, CZ, DE, DK, EE, ES, FI, FR, GR, HR, HU, IE, IT, LU, LV, MT, PL, PT, RO, SE, SI, SK
Communication records delivered, commissioned or operational4: QuCT NL (Quantum Communication Testbed) (NL), QUID (Quantum Italy Deployment) (IT), PTQCI (Portuguese Quantum Communication Infrastructure) (PT), CYQCI (Cyprus Quantum Communication Infrastructure) (CY)
Communication records not yet evidenced as deployed2: Eagle-1 satellite (EU), LATQN: experimental quantum communication infrastructure in Latvia (LV)

Data as of 2026-10-28. Assembled on 2026-11-02.

How it is calculated

Countries with a national EuroQCI project in the infrastructure catalogue, and quantum communication records of the deployment tracker whose furthest evidenced milestone is delivered, commissioned or operational, against those only planned.

Coverage: The infrastructure catalogue and the deployment tracker, both source-verified.

Limitations:

  • A national project is not a connected metropolitan area, and the tracker does not record QKD key rates or node counts.
  • The registries have no complete history, so there is no yearly series.

Where the data comes from:

Definition: Comm 3 live measure: countries with a national EuroQCI project

Sources

Attribution: Quantum Flagship Strategic Advisory Board, KPI booklet March 2025. The 2024 values were measured in early 2025 through surveys of SAB, QCB, QuIC and QUCATS members and verified and validated by the SAB (booklet page 2).

No reuse licence in the PDF or on qt.eu; the values are quoted as facts with attribution and the booklet is linked, not copied.