Skip to main content

PQC migration checkpoints of shared services

The checkpoints a post-quantum migration of a shared service goes through, who owns each one by role, what it waits for, the kind of each date and what a slip would delay. External prerequisites such as standards and industry rules carry their real status from recorded sources.

Reference model, not an agreed plan. No participant has agreed this plan and no coordination governance exists, so no checkpoint is agreed, no date is participant-agreed and no operational board is active. Participant checkpoints are proposed and undated. Owners are roles, never people. Not compliance advice.

Choose a reference service

Proposed, agreed and completed: Qualified electronic signatures and seals with a qualified trust service provider

10 checkpoints: 8 proposed, 0 agreed, 2 completed.

Nothing is agreed: no governance between participants exists. Completed checkpoints are external prerequisites whose completion a recorded source shows.

Planned dates by kind

  • Unknown: no date published or agreed: 9
  • Vendor roadmap date: 0
  • Official guidance target: 1
  • Verified legal obligation: 0
  • Participant-agreed date: 0

Readiness of the components and the action plan of this service

Checkpoint board

Stages give an order, not a schedule: a checkpoint is in a later stage than everything it waits for. Checkpoints in one stage can run in parallel; checkpoints that wait for each other share a stage and are agreed together.

Checkpoints of the service with owner, dependencies, dates, state and evidence
StageCheckpointOwner (role)Depends onPlanned date and its kindStateCompletedAcceptance evidenceBlockerNext reviewA slip affects
Stage 1ML-DSA in CMS published as an RFC
External prerequisite
Standards body or supervisor (outside the plan)NothingUnknown: no date published or agreedCompleted2025: RFC 9882, Proposed Standard, 2025.A Standards Track RFC.
RFC 9882: Use of the ML-DSA Signature Algorithm in the Cryptographic Message Syntax (CMS) (Proposed Standard, published 2025; read 2026-10-23)
NothingNo review cycle agreed4 checkpoints
Stage 1ETSI cryptographic suites list post-quantum signatures
External prerequisite
Standards body or supervisor (outside the plan)NothingUnknown: no date published or agreedCompleted2026-06: ETSI TS 119 312 V2.1.1, June 2026.A published ETSI specification listing the algorithms.
ETSI TS 119 312 V2.1.1: Electronic Signatures and Trust Infrastructures (ESI); Cryptographic Suites (Technical Specification, version 2.1.1 of June 2026; read 2026-10-23)
NothingNo review cycle agreed4 checkpoints
Stage 1Inventory of signing uses, certificates and documents that must stay verifiable
Participant checkpoint
Own organisationNothingOfficial guidance target:
EU roadmap first steps, which include inventories, by the end of 2026: a guidance target, not a legal deadline.
EU roadmap milestone 1: first steps and national roadmaps
Proposed
Can start: nothing it depends on is open
Not completedSigning uses, certificate profiles and retention periods recorded.NothingNo review cycle agreed3 checkpoints
Stage 2Migration dates for qualified trust services published
External prerequisite
Standards body or supervisor (outside the plan)ETSI cryptographic suites list post-quantum signaturesUnknown: no date published or agreedProposed
Can start: nothing it depends on is open
Not completedA published document with migration dates that applies to qualified trust services.
ETSI TS 119 312 V2.1.1: Electronic Signatures and Trust Infrastructures (ESI); Cryptographic Suites (Technical Specification, version 2.1.1 of June 2026; read 2026-10-23)
Clause 8.5 of TS 119 312 leaves migration dates to a separate document still being prepared when read.2027-01-282 checkpoints
Stage 2Qualified signature creation device supports ML-DSA
Participant checkpoint · Qualified signature creation device or remote signing HSM
Certificate authority or trust service providerETSI cryptographic suites list post-quantum signaturesUnknown: no date published or agreedProposed
Can start: nothing it depends on is open
Not completedA device release with ML-DSA and its certification status, recorded by the provider.NothingNo review cycle agreed2 checkpoints
Stage 2Signing application creates ML-DSA signatures in the agreed formats
Participant checkpoint · Signing application of the organisation
Own organisationInventory of signing uses, certificates and documents that must stay verifiable; ML-DSA in CMS published as an RFCUnknown: no date published or agreedProposed
Waiting for open dependencies
Not completedSigned test documents in each format used.NothingNo review cycle agreed1 checkpoint
Stage 2Recipients' validation software verifies ML-DSA signatures
Participant checkpoint · Recipients' signature validation software
Counterparty (the other organisation or its users)ML-DSA in CMS published as an RFCUnknown: no date published or agreedProposed
Can start: nothing it depends on is open
Not completedRecipients confirm validation of the signed test documents.NothingNo review cycle agreed1 checkpoint
Stage 2Plan for documents signed classically that must stay verifiable
Participant checkpoint
Own organisationInventory of signing uses, certificates and documents that must stay verifiableUnknown: no date published or agreedProposed
Waiting for open dependencies
Not completedA preservation approach per document class, for example re-sealing or archive timestamps.NothingNo review cycle agreed0 checkpoints
Stage 3Qualified certificates with ML-DSA keys offered
Participant checkpoint · Qualified trust service provider's certificate authority
Certificate authority or trust service providerQualified signature creation device supports ML-DSA; Migration dates for qualified trust services published; ML-DSA in CMS published as an RFCUnknown: no date published or agreedProposed
Waiting for open dependencies
Not completedA certificate profile published by the provider and accepted under its supervision.NothingNo review cycle agreed1 checkpoint
Stage 4End-to-end test: qualified certificate, signing and validation
Participant checkpoint
All parties of the service jointlyQualified certificates with ML-DSA keys offered; Signing application creates ML-DSA signatures in the agreed formats; Recipients' validation software verifies ML-DSA signaturesUnknown: no date published or agreedProposed
Waiting for open dependencies
Not completedA test record naming the provider, the formats and the validation results of each recipient.NothingNo review cycle agreed0 checkpoints

Mutual dependencies and parallel work

Checkpoints that wait for each other

None.

Checkpoints that can start now, in parallel

  • Stage 2: Migration dates for qualified trust services published; Qualified signature creation device supports ML-DSA; Recipients' validation software verifies ML-DSA signatures

If a checkpoint slips

Choose a checkpoint to see every checkpoint that waits for it, directly or further down. The portal does not compute new dates: where an affected checkpoint has a dated target, that target may no longer hold.

Kinds of date, kept apart

Unknown: no date published or agreed
Nothing published or agreed. Unknown dates stay unknown; the portal never fills them in.
Vendor roadmap date
A target a supplier announced for a release. A roadmap is not a release; shown only once an editor approved the vendor evidence in the product navigator.
Official guidance target
A date an authority sets as guidance, as the PQC migration timeline records it. Not a legal deadline and not agreed between the parties.
Verified legal obligation
A date a recorded legal act sets. None of the reference services has one.
Participant-agreed date
A date the parties of a service agreed. None exists: this is a reference model.