Skip to main content

Standards and PQC deadline tracker

In short: Every standard and PQC deadline with its status and next milestone. Filter by body, kind or status; each item shows its key facts first and folds its milestones and sources. Filter the tracker

Information only, not compliance or legal advice. Each status, date and deadline is as its official source states it on the date read; check the publisher for the authoritative current version. A milestone that is not verified is never used in the deadlines view, the feed, the early warning or the briefings.

Standards, specifications, committees and migration deadlines on post-quantum cryptography, quantum key distribution and quantum technologies: ETSI, CEN-CENELEC, ISO/IEC, ITU-T, IEEE, NIST and the IETF, the EU roadmap and the national agencies, each with its status and dates, its scope, what it means for organisations and its next milestone.

This page: every standard, committee and deadline with its status and next milestone. The other post-quantum pages: Guide: what post-quantum cryptography is and what to do first; Timeline by authority: the milestones of each EU and national authority, as its source states them; What is due when: everything due in the next 12 to 60 months, in date order, with a calendar feed; Compliance calendar: dated obligations and milestones beyond post-quantum.

Tracked items by body and status
BodyPublishedDraftIn developmentActiveWithdrawnTotal
ETSI ISG QKD10001011
ETSI TC CYBER400004
CEN-CENELEC5051011
ISO/IEC301105
ITU-T600006
IEEE004059
NIST512008
IETF702009
EU100102
ECCG / EUCC010203
ANSSI200103
BSI200103
Netherlands100001
NCSC-UK100001
Canada (CCCS, TBS)100102
NSA000101

Verification of the items on the date read: Verified: 57; Partly verified: 20; Not verified: 2.

3 items

Leitlinie zur Umstellung auf PQC (BMI/BMDS/BSI, Artikelnummer BMI26024): Nationale Umsetzung der EU-Roadmap zur Umstellung auf Post-Quanten-Kryptografie

Body
BSI (Germany)
Kind
Migration deadlines
Status
Published (2026-10-12). Joint guideline of BMDS, BMI and BSI; document header dated 11 September 2026 (Stand August 2026); published with BSI press release of 12.10.2026
Scope
Post-quantum cryptography
Jurisdiction
Germany
What it means for organisations
Transfers the EU roadmap's risk-based deadlines into a German national timeline for administrations, critical infrastructure operators and companies.
Next milestone
: Initial preparation and planning phase (PQC readiness) complete and first migration steps started · Deadline · BSI: Nationale Umsetzung der EU-Roadmap zur Umstellung auf Post-Quanten-Kryptografie (PDF) (read 2026-10-25; Header (11. September 2026); section 3 Zeitplan; section 4 intro; 4.1 Fristen verbindlich machen; inventory subsection; Impressum (Stand August 2026))
Milestones, links, verification and sources
Dated milestones
  • : Initial preparation and planning phase (PQC readiness) complete and first migration steps started
  • : Initial cryptographic inventory complete
  • : Responsible bodies (e.g. IT-Planungsrat, UP KRITIS) adopt the deadlines as binding where possible
  • : High-risk use cases quantum-safe (High risk)
  • : Medium-risk use cases quantum-safe; transition largely complete for nearly all systems (Medium risk)
In the portal
Migration timeline entry
Verification
Verified. Guideline PDF (646 KB) retrieved from bsi.bund.de and text extracted; dates read in the summary box, section 3 'Zeitplan', section 4 intro, 4.1 and the inventory subsection. Press release read for publication date. The PDF calls the deadlines urgent recommendations, not legally binding.
Sources

BSI TR-02102-1 Version 2026-01: Kryptographische Verfahren: Empfehlungen und Schlüssellängen

Body
BSI (Germany)
Kind
Migration deadlines
Status
Published (2026-01-23). Version 2026-01 (Stand 23 January 2026) adds migration deadlines and announces end of sole use of classical asymmetric schemes
Scope
Post-quantum cryptography
Jurisdiction
Germany
What it means for organisations
Gives German product and system designers dates after which classical key agreement and, later, classical signatures are recommended only in hybrid combination with PQC.
Next milestone
: Switch to quantum-safe key agreement for very high protection needs (Applications with very high protection needs) · Deadline · BSI: TR-02102-1 Kryptographische Verfahren: Empfehlungen und Schlüssellängen (PDF) (read 2026-10-25; Cover and version table (2026-01, 23.01.2026); section 2.1 Einsatz quantensicherer Verfahren; section 2.3 Klassische asymmetrische Verfahren)
Milestones, links, verification and sources
Dated milestones
  • : Switch to quantum-safe key agreement for very high protection needs (Applications with very high protection needs)
  • : End of the period in which the guideline lists classical key agreement on its own; hybrid with a PQC KEM afterwards (Key agreement / encryption)
  • : Classical signature schemes expected to remain in the guideline only until the end of 2035 (Signatures)
In the portal
Reference record
Verification
Verified. TR PDF downloaded from bsi.bund.de and text extracted; version table and sections 2.1 and 2.3 read. Press release of 11.02.2026 confirms the same three dates. The new guideline cites a TR-02102-1 edition dated December 2026, which is not yet available; the current file is version 2026-01.
Sources

BSI VS-IT PQC transition deadlines: VS-IT: Umstellungsfristen für Post-Quanten-Kryptografie vereinbart

Body
BSI (Germany)
Kind
Migration deadlines
Status
Active (2025-10-31). Announced 31.10.2025
Scope
Post-quantum cryptography
Jurisdiction
Germany
What it means for organisations
Signals to vendors of approved German classified-information (VS-NfD) IT security products that quantum-resistant versions are expected by 2030.
Next milestone
: Quantum-resistant IT security products available for VS-NfD protection (Classified information (VS-NfD) products) · Deadline · BSI: Presse - VS-IT: Umstellungsfristen für Post-Quanten-Kryptografie vereinbart (read 2026-10-25; News item dated 31.10.2025, body text)
Milestones, links, verification and sources
Dated milestones
  • : Quantum-resistant IT security products available for VS-NfD protection (Classified information (VS-NfD) products)
Verification
Verified. News item read on bsi.bund.de. The detailed binding deadlines for approved VS-IT products are referenced but not listed on the page.
Sources

Sources compiled 2026-10-27; assembled 2026-11-04. Reviewed every 90 days. Past milestones of the PQC transition are on the migration timeline.