Skip to main content

Standards and PQC deadline tracker

In short: Every standard and PQC deadline with its status and next milestone. Filter by body, kind or status; each item shows its key facts first and folds its milestones and sources. Filter the tracker

Information only, not compliance or legal advice. Each status, date and deadline is as its official source states it on the date read; check the publisher for the authoritative current version. A milestone that is not verified is never used in the deadlines view, the feed, the early warning or the briefings.

Standards, specifications, committees and migration deadlines on post-quantum cryptography, quantum key distribution and quantum technologies: ETSI, CEN-CENELEC, ISO/IEC, ITU-T, IEEE, NIST and the IETF, the EU roadmap and the national agencies, each with its status and dates, its scope, what it means for organisations and its next milestone.

This page: every standard, committee and deadline with its status and next milestone. The other post-quantum pages: Guide: what post-quantum cryptography is and what to do first; Timeline by authority: the milestones of each EU and national authority, as its source states them; What is due when: everything due in the next 12 to 60 months, in date order, with a calendar feed; Compliance calendar: dated obligations and milestones beyond post-quantum.

Tracked items by body and status
BodyPublishedDraftIn developmentActiveWithdrawnTotal
ETSI ISG QKD10001011
ETSI TC CYBER400004
CEN-CENELEC5051011
ISO/IEC301105
ITU-T600006
IEEE004059
NIST512008
IETF702009
EU100102
ECCG / EUCC010203
ANSSI200103
BSI200103
Netherlands100001
NCSC-UK100001
Canada (CCCS, TBS)100102
NSA000101

Verification of the items on the date read: Verified: 57; Partly verified: 20; Not verified: 2.

9 items

IEEE P7130: IEEE Draft Standard for Quantum Technologies Definitions

Body
IEEE Standards Association
Kind
Specification
Status
In development (2021-09-23). Active PAR (approved 2021-09-23), C/SABSC, QCN-WG; PAR extended to 2026-12-31 by the SASB on 2025-12-10; no approved IEEE 7130 standard (no '7130-2023') found
Scope
Quantum technologies in general
Jurisdiction
International
What it means for organisations
Would give a consensus set of quantum technology terms for IEEE and wider use, but it remains a draft.
Next milestone
: PAR expires · Review or expiry date · IEEE SA: SASB Meeting Minutes 10 December 2025 (PDF) (read 2026-10-25; 3.2.3 NesCom Recommendations, Extension Requests, P7130)
Milestones, links, verification and sources
Dated milestones
  • : PAR expires
Verification
Verified. Project page shows title, Active PAR and PAR approval 2021-09-23 but not the expiry; expiry read in the SASB minutes of 10 December 2025 (NesCom extension requests, approved on the consent agenda). The brief's 'IEEE 7130-2023' could not be confirmed: no approved standard exists on the project page.
Sources

IEEE P1943: Standard for Post-Quantum Network Security

Body
IEEE Standards Association
Kind
Work item or project
Status
In development (2022-06-16). Active PAR, approved 2022-06-16 (COM/NetSoft-SC, QuNET/WG)
Scope
Post-quantum cryptography
Jurisdiction
International
What it means for organisations
Would specify how existing network security protocols can be run in post-quantum and hybrid modes.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Partly verified. Title, status and PAR approval date read on the project page. The PAR expiry is only on the IEEE myProject PAR detail page, which returned HTTP 502.
Sources

IEEE P1947: Standard for Quantum Cybersecurity Framework

Body
IEEE Standards Association
Kind
Work item or project
Status
In development (2024-03-21). Active PAR, approved 2024-03-21 (COM/NetSoft-SC)
Scope
Post-quantum cryptography
Jurisdiction
International
What it means for organisations
Would describe quantum-era threat vectors to data security and matching defence mechanisms in one framework.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Partly verified. Title, status, committee and PAR approval date read on the project page. PAR expiry not shown there; PAR detail page returned HTTP 502.
Sources

IEEE P3329: Standard for Quantum Computing Energy Efficiency

Body
IEEE Standards Association
Kind
Work item or project
Status
In development (2023-02-15). Active PAR, approved 2023-02-15 (C/SABSC, Quantum Energy Initiative WG)
Scope
Quantum computing
Jurisdiction
International
What it means for organisations
Would define metrics relating quantum computing performance to energy consumption across qubit technologies.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Partly verified. Title, status, committee and PAR approval date read on the project page (the IEEE quantum activities page uses a longer title including 'and Simulation'). PAR expiry not shown; PAR detail page returned HTTP 502.
Sources
Withdrawn projects (5)

IEEE P7131: Standard for Quantum Computing Performance Metrics & Performance Benchmarking

Body
IEEE Standards Association
Kind
Work item or project
Status
Withdrawn (2024-12-09). Expired PAR administratively withdrawn at NesCom on 2024-12-09 (C/SABSC); project page no longer available
Scope
Quantum computing
Jurisdiction
International
What it means for organisations
Leaves no active IEEE standard project on quantum computing performance benchmarking under this number.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Verified. Withdrawal read in the NesCom minutes of 9 December 2024 (2.1.1 Administratively Withdrawn PARs) and the December 2024 list of PARs for administrative withdrawal. The former project page returns an unavailable message.
Sources

IEEE P3155: Standard for Programmable Quantum Simulator

Body
IEEE Standards Association
Kind
Work item or project
Status
Withdrawn (2023-06-29). New PAR February 2022 (NTC/SC); PAR withdrawn by the SASB on 2023-06-29
Scope
Quantum computing
Jurisdiction
International
What it means for organisations
Leaves no active IEEE standard project for programmable quantum simulators under this number.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Verified. New PAR read on the SASB February 2022 board actions page; withdrawal read on the SASB 29 June 2023 board actions page.
Sources

IEEE P3120: Standard for Quantum Computing Architecture

Body
IEEE Standards Association
Kind
Work item or project
Status
Withdrawn (2025-06). PAR withdrawn by the SASB at its 19-20 June 2025 meeting (C/MSC)
Scope
Quantum computing
Jurisdiction
International
What it means for organisations
Leaves no active IEEE standard project for quantum computing architecture under this number.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Verified. Withdrawal read on the SASB board actions page for 19 and 20 June 2025; the page does not state which of the two days.
Sources

IEEE P3172: Recommended Practice for Post-Quantum Cryptography Migration

Body
IEEE Standards Association
Kind
Work item or project
Status
Withdrawn (2025-11-04). PAR withdrawn by the SASB on 2025-11-04 (C/CPSC)
Scope
Post-quantum cryptography
Jurisdiction
International
What it means for organisations
Leaves no active IEEE recommended practice on PQC migration under this number.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Verified. Title and withdrawal read on the SASB board actions page of 4 November 2025. The original PAR approval (May 2022) was seen only in search results, not on a fetched page.
Sources

IEEE P3185: Standard for Hybrid Quantum-Classical Computing

Body
IEEE Standards Association
Kind
Work item or project
Status
Withdrawn (2025-09-10). PAR withdrawn by the SASB on 2025-09-10 (C/SABSC); project page now unavailable though the IEEE quantum activities page still features it
Scope
Quantum computing
Jurisdiction
International
What it means for organisations
Leaves no active IEEE standard project on hybrid quantum-classical computing architecture under this number.
Next milestone
None stated by the sources read.
Milestones, links, verification and sources
Verification
Verified. Withdrawal read on the SASB board actions page of 10 September 2025. The project page returned an unavailable message today; the IEEE quantum standards activities page still lists it as a featured project, which looks out of date.
Sources

Sources compiled 2026-10-27; assembled 2026-11-04. Reviewed every 90 days. Past milestones of the PQC transition are on the migration timeline.