Skip to main content

KPI observatory

The key performance indicators that the Strategic Advisory Board of the Quantum Flagship uses to follow quantum technologies in Europe: 25 indicators in six areas, some with parts, from 2021 to 2024 against the targets for 2030.

Each card shows the official 2024 value and the 2030 target as published, the trajectory this portal calculates from the official values, and a live measure from the data of the portal where one exists. Live measures are proxies with their own method and coverage; they never replace the official values.

Source: Key Performance Indicators for Quantum Technologies in Europe (Quantum Flagship Strategic Advisory Board, March 2025). The 2024 values were measured in early 2025 through surveys of SAB, QCB, QuIC and QUCATS members and verified and validated by the SAB (booklet page 2).

Live measures assembled on 2026-11-02 from the stored data of the portal. Pilot, pending editorial review.

Download all indicators as JSON · Download all indicators as CSV · How the trajectory is calculated

The six areas are those of the KPI booklet, kept as published. The portal’s own technology pillars follow the draft SRIA 2026: Quantum Computing and Quantum Simulation below are the two parts of its computing and simulation pillar, and enabling technologies and the supply chain have no area of their own in the booklet. Why the portal uses four pillars

Goals and KPIs proposed in the draft SRIA 2026

At a glance

9 of 22 assessed indicators are on pace or have reached their 2030 target.

  • 1 Target reached
  • 8 On pace
  • 4 On pace only if growth compounds
  • 9 Slower than needed
  • 8 Not assessed

30 indicators and parts in total; 16 with a live measure of the portal. Status by the first measure of each indicator, calculated by this portal from the official values, not the colours of the booklet.

Definitions: Indicators by trajectory status; Trajectory towards the 2030 target

Quantum Communication

  • Comm 1

    Performance

    2024, official
    12
    2030 target
    20
    60% of the 2030 target
    Values as a table Comm 1
    Official values of Comm 1 as published by the SAB
    YearValue
    20212
    20225
    202311
    202412

    On pace Recent pace +3.3 a year; needed +1.3 a year to 2030.

    Live measure

    No automatic measure. No source of the portal records communication subsystems or their state of the art.

    Details, method and sources Comm 1

  • Comm 2a

    European technical leadership: quantum information networks

    2024, official
    10** km
    2030 target
    500 km
    2% of the 2030 target
    Values as a table Comm 2a
    Official values of Comm 2a as published by the SAB
    YearValue
    20211.3 km
    20221.3* km
    20231.3* km
    202410** km

    On pace only if growth compounds Recent pace +2.9 a year; needed +81.7 a year to 2030.

    Live measure

    No automatic measure. Distances of heralded entanglement come from experiments in the literature; the portal does not track them.

    Details, method and sources Comm 2a

  • Comm 2b

    European technical leadership: quantum secure networks

    2024, official
    248 km @1.4 bits/s***; 1 new realized protocol (BBM92)
    2030 target
    n/a (under review)
    Values as a table Comm 2b
    Official values of Comm 2b as published by the SAB
    YearValue
    2021-
    2022-
    2023248 km @1.4 bits/s***; 1 new realized protocol (BBM92)
    2024248 km @1.4 bits/s***; 1 new realized protocol (BBM92)

    Not assessed The indicator is a rank or a description, not a quantity.

    Live measure

    No automatic measure. Key exchange distances and new protocols come from experiments in the literature; the portal does not track them.

    Details, method and sources Comm 2b

  • Comm 3

    Deployment

    2024, official
    20 metropolitan areas; 10 nodes
    2030 target
    25 metropolitan areas; 75 nodes
    80% of the 2030 target
    Values as a table Comm 3
    Official values of Comm 3 as published by the SAB
    YearValue
    20211 metropolitan area; 8 nodes
    202215 metropolitan areas; 10 nodes
    202316 metropolitan areas; 10 nodes
    202420 metropolitan areas; 10 nodes

    On pace Recent pace +6.3 a year; needed +0.8 a year to 2030.

    Live measure (portal proxy, not the official value)

    EuroQCI national projects and evidenced communication deployments

    25 countries Countries with a national EuroQCI project

    How it is calculated

    Countries with a national EuroQCI project in the infrastructure catalogue, and quantum communication records of the deployment tracker whose furthest evidenced milestone is delivered, commissioned or operational, against those only planned.

    Coverage: The infrastructure catalogue and the deployment tracker, both source-verified.

    • A national project is not a connected metropolitan area, and the tracker does not record QKD key rates or node counts.
    • The registries have no complete history, so there is no yearly series.

    Data as of 2026-10-28.

    Definition: Comm 3 live measure: countries with a national EuroQCI project

    Details, method and sources Comm 3

  • Comm 4

    Adoption

    2024, official
    10
    2030 target
    30
    33% of the 2030 target
    Values as a table Comm 4
    Official values of Comm 4 as published by the SAB
    YearValue
    20215
    20229
    202310
    202410

    On pace only if growth compounds Recent pace +1.7 a year; needed +3.3 a year to 2030.

    Live measure (portal proxy, not the official value)

    Documented quantum communication use cases

    5 use cases Documented quantum communication use cases

    How it is calculated

    Use cases of the adoption directory classified as quantum communication, counted cumulatively by the year of their source. Post-quantum cryptography cases are classical security and are not counted.

    Coverage: The source-verified use cases of the adoption directory.

    • A curated selection of documented cases, not every service on the market.

    Data as of 2026-10-21.

    Definition: Comm 4 live measure: documented quantum communication use cases

    Details, method and sources Comm 4

Definitions: Official KPI values and 2030 targets; Progress towards the 2030 target; Trajectory towards the 2030 target

How the trajectory is calculated

  • Recent pace: the yearly change from the first to the last numeric official value, (last - first) / years between them.
  • When the official values rise and fall (for example Eco 1: 344, 408, 551 and 344), the first and last values alone would hide the movement between them, so the recent pace is the least-squares slope of all numeric values (a straight line fitted through them), and the compound rate comes from the same fit on their logarithms. The formula of each indicator says which method was used.
  • Needed pace: (2030 target - last value) / years left until 2030.
  • On pace when the recent pace is at least the needed pace; target reached when the last value already meets the target; on pace only if growth compounds when the yearly growth rate of the same years, kept until 2030, would reach the target although the linear pace would not; slower than needed otherwise.
  • Not assessed: ranks, descriptions, indicators with fewer than two numeric values, and targets under review.
  • Progress bars appear only where the value and the target share a unit.

The booklet marks each indicator with one of these four colours (page 4). The colours are not reproduced here; the booklet itself shows them. Some 2030 targets are still under discussion and shown as n/a; the targets of Communication 2b, Computing 2 and Simulation 3 and 4 are under review (booklet pages 3 and 20).

Use the print command of your browser to keep this scorecard as a PDF.